IP Australia to allow multiple streamlined COVID-19 extensions of time

As noted in our previous blog post, IP Australia introduced a new streamlined process for extension of time requests for Applicants impacted by COVID-19. 

These arrangements have now been extended until at least 30 September 2020.

In a new development, IP Australia are also allowing a further streamlined COVID-19 extension even if you have previously received an extension.  Until this announcement, only one streamlined COVID-19 extension request per case/action was allowable.

By way of reminder, extension of time is available to extend most Patents, Trade Marks, and Designs deadlines for up to three months, and is:

  • free of charge – associated fees will be waived or refunded; and
  • only requires the submission of a simplified request based on standard text made available by IP Australia.  This differs to standard extension of time requests that require a statutory declaration to be submitted setting out the circumstances for the extension.

One notable exception is that the arrangement does not apply to extensions of time for payment of renewal fees. 

BCSE(Hons) MIP FIPTA

Mark’s academic background is in computer science and electrical engineering. He assists clients in obtaining and enforcing their intellectual property rights in the areas of software, electronics and engineering. Prior to joining Phillips Ormonde Fitzpatrick, Mark worked with a major Australian car manufacturer within their Current and Past Model Engineering group.